Artikelen bij COM(2023)574 - Wijziging van Uitvoeringsbesluit (EU) (ST 12275/22 INIT; ST 12275/22 INIT ADD 1) van 4 oktober 2022 betreffende de goedkeuring van de beoordeling van het herstel- en veerkrachtplan voor Nederland - Hoofdinhoud
Dit is een beperkte versie
U kijkt naar een beperkte versie van dit dossier in de EU Monitor.
dossier | COM(2023)574 - Wijziging van Uitvoeringsbesluit (EU) (ST 12275/22 INIT; ST 12275/22 INIT ADD 1) van 4 oktober 2022 betreffende de ... |
---|---|
document | COM(2023)574 |
datum | 29 september 2023 |
Inhoudsopgave
Article 1
(1) Article 1 is replaced by the following:
“Article 1
Approval of the assessment of the RRP
The assessment of the modified RRP of the Netherlands on the basis of the criteria provided for in Article 19(3) of Regulation (EU) 2021/241 is approved. The reforms and investment projects under the RRP, the arrangements and timetable for the monitoring and implementation of the RRP, including the relevant milestones and targets, the relevant indicators relating to the fulfilment of the envisaged milestones and targets, and the arrangements for providing full access by the Commission to the underlying relevant data are set out in the Annex to this Decision.”;
(2) In Article 2, paragraphs 1 and 2 are replaced by the following:
“1. The Union shall make available to the Netherlands a financial contribution in the form of non-repayable support amounting to EUR 5 441 423 046. 5 That contribution includes:
(a)an amount of EUR 3 929 409 575 that shall be available to be legally committed by 31 December 2022;
(b)an amount of EUR 777 653 896 that shall be available to be legally committed from 1 January 2023 until 31 December 2023;
(c)an amount of EUR 454 359 575 6 , in accordance with Article 21a(6) of Regulation (EU) 2021/241, exclusively for measures referred to in Article 21c of that Regulation, with the exception of measures referred to in Article 21c(3), point (a);
(d)an amount of EUR 280 000 000, transferred from the Brexit Adjustment Reserve to the Facility.
The Union financial contribution shall be made available by the Commission to the Netherlands in instalments in accordance with the Annex to this Decision.
The instalments may be disbursed by the Commission in one or several tranches. The size of the tranches shall be subject to the availability of funding.”
(3) The Annex is replaced by the text in the Annex to this Decision: